Tynagh Outage 15.09.2017
Publication date: 21:54 15/09/2017
Message ID: TYN_000001_01
Event Status: open
Type of unavailability: Production Unavailability
Type of event: unplanned
Time/date of incident start: 21:29 15/09/2017
Estimated time/date of incident end: 21:29 16/09/2017
Unit of measurement: MW
Unavailable capacity: 104
Available capacity: 300
Installed capacity: 404 MW
Reason for unavailability: Plant is currently declared to a minimum load of 300MW’s due to purge valve issue. This prevents the GT going into Diffusion mode D5. EC&I informed and currently working on the issue.
Remarks:
Fuel Type: Fossil Gas
Bidding Zone: 10Y1001A1001A59C
Affected Asset or Unit: Tynagh Production Unit
Affected Asset or Unit EIC: 47W000000000172K
Market Participant: Tynagh Energy Limited
Market Participant Code: A0001577W.IE