Tynagh outage 15.09.2017

Publication date: 22:50 15/09/2017

Message ID: TYN_000001_03

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 21:29 15/09/2017

Estimated time/date of incident end: 22:31 15/09/2017

Unit of measurement: MW

Unavailable capacity:

Available capacity: 404

Installed capacity: 404 MW

Reason for unavailability: Minimum load had increased from 194 to 300 Issue with GT purge valve is rectified and the plant is declared to its normal availability.

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE