Tynagh Outage 15.06.2018

Publication date: 00:55 16/06/2018

Message ID: TYN_000001_08

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 23:44 15/06/2018

Estimated time/date of incident end: 17:00 31/07/2018

Unit of measurement: MW

Unavailable capacity: 26

Available capacity: 378

Installed capacity: 404 MW

Reason for unavailability: Suspected Gas Turbine Water Injection system lockout which caused high exhaust temperature trip

Remarks:

Distillate remains declared to 0

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE