Tynagh Energy Limited
Call Us: +353 (0)1 857 8700 | Fax: +353 (0)1 857 8701 | Email: info@tynaghenergy.ie |
  • Home
  • About Us
    • Who is Tynagh Energy
    • Fact Sheet
    • Construction
    • CER Competition
  • Environment / H&S
    • Health & Safety Policy Statement
    • Health & Safety Statistics
    • Environment
  • Community
    • Local Community
    • Community Projects
    • Community News
    • Local Economy
    • Local Schools
    • Information Brochures
  • Operations
    • Operation & Maintenance
    • Trading
    • Risk & Regulatory
    • Technology
    • REMIT Notifications
  • Energy Market
    • All Island Energy Market
    • SEM (Single Electricity Market)
    • Renewables
    • EU Market Integration
    • Integrated SEM (I-SEM)
    • Relevant Links
  • Consultations
    • Responses 2018
    • Responses 2017
    • Responses 2016
    • Responses 2015
    • Responses 2014
    • Responses 2013
    • Responses 2012
    • Responses 2011
  • Sales
  • News
  • Contact

Operation & Maintenance

Tynagh Energy Limited / Operations / Operation & Maintenance

Operation & Maintenance (O&M)

Routine operating and maintenance of the Tynagh Power Plant are under an Operation and Maintenance Agreement (OMA) with GE Energy.

Long-term maintenance of the Gas Turbine is under a Contractual Services Agreement (CSA) with General Electric International Inc. Major and minor inspections and condition monitoring of the Steam Turbine are under a separate Steam Turbine CSA which is also with General Electric International Inc.

Plant Maintenance Outages

Routine Outages take place periodically to ensure the maintenance of the Plant. Here are some photos taken from the most recent Major Plant Maintenance Outage.

Steam Turbine half shell – internal diaphragm alignment in progress.
Steam Turbine half shell – internal diaphragm alignment in progress.
Gas Turbine rotor with new buckets installed.
Gas Turbine rotor with new buckets installed.
Low pressure Steam Turbine rotor following blast cleaning.
Low pressure Steam Turbine rotor following blast cleaning.
Gas Turbine rotor removal.
Gas Turbine rotor removal.
Gas turbine disassembly in progress
Gas turbine disassembly in progress
Steam Turbine reassembly – High pressure rotor visible.
Steam Turbine reassembly – High pressure rotor visible.

Click on links below for more information on GE’s O&M services;

  • GE Operating & Maintenance services

Contact Info

Email: info@tynaghenergy.ie
Tel:  +353 (0)1 857 8700
Fax: +353 (0)1 857 8701

Address

Tynagh Energy Limited The Crescent Building Northwood Park Santry, Dublin 9
D09 X8W3
Ireland

Local Community

Recent REMIT Notifications

  • Information note on Tynagh's transition to Nordpool's IIP
  • Information note on Tynagh's transition to Nordpool's IIP
  • Tynagh move to nordpool
  • Information note on Tynagh's transition to Nordpool's IIP
  • Tynagh Outage 22.06.2020
© 2013 Tynagh Energy Limited | CRN:378735 | Disclaimer
Back to Top
health check