Tynagh Energy Limited
Call Us: +353 (0)1 857 8700 | Fax: +353 (0)1 857 8701 | Email: info@tynaghenergy.ie |
  • Home
  • About Us
    • Who is Tynagh Energy
    • Fact Sheet
    • Construction
    • CER Competition
  • Environment / H&S
    • Health & Safety Policy Statement
    • Health & Safety Statistics
    • Environment
  • Community
    • Local Community
    • Community Projects
    • Community News
    • Local Economy
    • Local Schools
    • Information Brochures
  • Operations
    • Operation & Maintenance
    • Trading
    • Risk & Regulatory
    • Technology
    • REMIT Notifications
  • Energy Market
    • All Island Energy Market
    • SEM (Single Electricity Market)
    • Renewables
    • EU Market Integration
    • Integrated SEM (I-SEM)
    • Relevant Links
  • Consultations
    • Responses 2018
    • Responses 2017
    • Responses 2016
    • Responses 2015
    • Responses 2014
    • Responses 2013
    • Responses 2012
    • Responses 2011
  • Sales
  • News
  • Contact

Availability Incidents

Information note on Tynagh’s transition to Nordpool’s IIP

Publication date: 17:33 30/06/2020

Message ID:

Event Status:

Type of unavailability:

Type of event:

Time/date of incident start:

Estimated time/date of incident end:

Unit of measurement:

Unavailable capacity:

Available capacity:

Installed capacity:

Reason for unavailability:

Remarks:

Tynagh will no longer be publishing outage updates at https://www.tynaghenergy.ie/commercial/active-incidents/ and will commence publishing on Nordpool’s IIP platform effective from 30/06/2020: https://umm.nordpoolgroup.com/#/messages?publicationDate=all&eventDate=nextweek

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 30, 2020Incidents

Tynagh Outage 22.06.2020

Publication date: 17:21 29/06/2020

Message ID: TYN_0000011_06

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 17:52 22/06/2020

Estimated time/date of incident end: 22:00 01/07/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Combustion hardware issue. Note: Pending EirGrid approval the plant will be generating for testing purposes from 09:00 on the morning of the 1st and will be available for dispatch at 22:00.  

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 29, 2020Incidents

Tynagh Outage 22.06.2020

Publication date: 08:19 29/06/2020

Message ID: TYN_0000011_05

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 17:52 22/06/2020

Estimated time/date of incident end: 21:00 30/06/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Combustion Hardware Issue Note: Pending EirGrid approval the plant will be generating for testing purposes from 06:00 on the morning of the 30th and will be available for dispatch at 21:00.

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 29, 2020Incidents

Tynagh Outage 22.06.2020

Publication date: 11:28 27/06/2020

Message ID: TYN_0000011_04

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 17:52 22/06/2020

Estimated time/date of incident end: 19:30 30/06/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Combustion hardware issue. Pending tuning approval the plant will be generating from 08:30 in the morning and will be available for dispatch at 19:30

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 27, 2020Incidents

Tynagh Outage 22.06.2020

Publication date: 17:17 23/06/2020

Message ID: TYN_0000011_03

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 17:52 22/06/2020

Estimated time/date of incident end: 17:00 29/06/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Combustion hardware issue

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 23, 2020Incidents

Tynagh Outage 22.06.2020

Publication date: 22:18 22/06/2020

Message ID: TYN_0000011_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 17:52 22/06/2020

Estimated time/date of incident end: 23:00 23/06/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Under investigation

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 22, 2020Incidents

Tynagh Outage 22.06.2020

Publication date: 18:15 22/06/2020

Message ID: TYN_0000011_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 17:52 22/06/2020

Estimated time/date of incident end: 23:00 22/06/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Under investigation  

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 22, 2020Incidents

Tynagh Outage 22.06.2020

Publication date: 10:56 22/06/2020

Message ID: TYN_0000010_03

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 07:30 22/06/2020

Estimated time/date of incident end: 10:26 22/06/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: ST bearing metal thermocouple issue

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 22, 2020Incidents

Tynagh Outage 22.06.2020

Publication date: 10:05 22/06/2020

Message ID: TYN_0000010_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 07:30 22/06/2020

Estimated time/date of incident end: 10:30 22/06/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: ST bearing metal thermocouple issue

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 22, 2020Incidents

Tynagh Outage 22.06.2020

Publication date: 08:05 22/06/2020

Message ID: TYN_0000010_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 07:30 22/06/2020

Estimated time/date of incident end: 10:00 22/06/2020

Unit of measurement: MW

Unavailable capacity: 404MW

Available capacity: 0MW

Installed capacity: 404 MW

Reason for unavailability: ST bearing metal thermocouple issue

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 22, 2020Incidents

Tynagh Outage 12.06.2020

Publication date: 17:59 12/06/2020

Message ID: TYN_000009_03

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 07:00 12/06/2020

Estimated time/date of incident end: 19:10 12/06/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Lean blow out

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 12, 2020Incidents

Tynagh Outage 12.06.2020

Publication date: 13:02 12/06/2020

Message ID: TYN_000009_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 07:00 12/06/2020

Estimated time/date of incident end: 23:00 12/06/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: under investigation

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 12, 2020Incidents

Tynagh Outage 12.06.2020

Publication date: 07:22 12/06/2020

Message ID: TYN_000009_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 07:00 12/06/2020

Estimated time/date of incident end: 14:00 12/06/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: under investigation

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 12, 2020Incidents

Tynagh Outage 21.05.2020

Publication date: 18:45 22/05/2020

Message ID: TYN_000008_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 21/05/2020

Estimated time/date of incident end: 20:06 22/05/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Planned outage, Gas Turbine leak repair.

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

May 22, 2020Incidents

Tynagh Outage 21.05.2020

Publication date: 11:00 20/05/2020

Message ID: TYN_000008_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 21/05/2020

Estimated time/date of incident end: 23:00 23/05/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Planned outage, Gas Turbine leak repair

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

May 20, 2020Incidents

Tynagh Outage 12.05.2020

Publication date: 12:05 12/05/2020

Message ID: TYN_000007_03

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 08:00 12/05/2020

Estimated time/date of incident end: 11:11 12/05/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Gas Performance valves issue

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

May 12, 2020Incidents

Tynagh Outage 12.05.2020

Publication date: 04:15 12/05/2020

Message ID: TYN_000006_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 01:20 12/05/2020

Estimated time/date of incident end: 08:00 12/05/2020

Unit of measurement: MW

Unavailable capacity: 364

Available capacity: 40

Installed capacity: 404 MW

Reason for unavailability: GT runback and ST tripped

Remarks:

Retrospective update to correct error in the estimated time/date of incident end field. Originally posted as 08:00 12/05/2020 should have been posted as 09:00 12/05/2020.

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

May 12, 2020Incidents

Tynagh Outage 12.05.2020

Publication date: 08:43 12/05/2020

Message ID: TYN_000007_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 08:00 12/05/2020

Estimated time/date of incident end: 23:00 12/05/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Gas Performance valves issue

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

May 12, 2020Incidents

Tynagh Outage 12.05.2020

Publication date: 01:42 12/05/2020

Message ID: TYN_000006_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 01:20 12/05/2020

Estimated time/date of incident end: 06:00 12/05/2020

Unit of measurement: MW

Unavailable capacity: 349

Available capacity: 55

Installed capacity: 404 MW

Reason for unavailability: GT runback and ST tripped

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

May 12, 2020Incidents

Tynagh Outage 08.05.2020

Publication date: 05:08 08/05/2020

Message ID: TYN_000005_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 03:01 08/05/2020

Estimated time/date of incident end: 04:52 08/05/2020

Unit of measurement: MW

Unavailable capacity: 349

Available capacity: 55

Installed capacity: 404 MW

Reason for unavailability: GT runback and ST tripped

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

May 8, 2020Incidents

Tynagh Outage 08.05.2020

Publication date: 03:58 08/05/2020

Message ID: TYN_000005_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 03:01 08/05/2020

Estimated time/date of incident end: 09:00 08/05/2020

Unit of measurement: MW

Unavailable capacity: 349

Available capacity: 55

Installed capacity: 404 MW

Reason for unavailability: GT runback and ST tripped

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

May 8, 2020Incidents

Tynagh Outage 27.04.2020

Publication date: 17:30 30/04/2020

Message ID: TYN_000004_06

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 14:35 27/04/2020

Estimated time/date of incident end: 20:30 01/05/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Plant Trip due to combustion trouble – Note the plant intends to start up for testing at 10:00 on the 1st, and to be fully available for dispatch at 20:30 that evening.

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

April 30, 2020Incidents

Tynagh Outage 27.04.2020

Publication date: 14:21 30/04/2020

Message ID: TYN_000004_05

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 14:35 27/04/2020

Estimated time/date of incident end: 19:30 01/05/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Plant Trip due to combustion trouble – Note the plant intends to start up for testing at 09:00 on the 1st, and to be fully available for dispatch at 19:30 that evening.

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

April 30, 2020Incidents

Tynagh Outage 27.04.2020

Publication date: 19:36 29/04/2020

Message ID: TYN_000004_04

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 14:35 27/04/2020

Estimated time/date of incident end: 17:00 01/05/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Plant Trip due to combustion trouble – Note the plant intends to start up for testing at 06:30 on the 1st, and to be fully available for dispatch at 17:00 that evening.

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

April 29, 2020Incidents

Tynagh Outage 27.04.2020

Publication date: 10:20 28/04/2020

Message ID: TYN_000004_03

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 14:35 27/04/2020

Estimated time/date of incident end: 23:00 29/04/2020

Unit of measurement: MW

Unavailable capacity: 404MW

Available capacity: 0MW

Installed capacity: 404 MW

Reason for unavailability: Plant Trip due combustion trouble – Inspecting hardware

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

April 28, 2020Incidents

Tynagh Outage 27.4.2020

Publication date: 17:30 27/04/2020

Message ID: TYN_000004_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 14:35 27/04/2020

Estimated time/date of incident end: 23:00 28/04/2020

Unit of measurement: MW

Unavailable capacity: 404MW

Available capacity: 0MW

Installed capacity: 404 MW

Reason for unavailability: Cause of Outage: Plant Trip due combustion trouble

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

April 27, 2020Incidents

Tynagh Outage 27.04.2020

Publication date: 14:49 27/04/2020

Message ID: TYN_000004_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 14:35 27/04/2020

Estimated time/date of incident end: 20:00 27/04/2020

Unit of measurement: MW

Unavailable capacity: 404 MW

Available capacity: 0MW

Installed capacity: 404 MW

Reason for unavailability: Plant trip due to combustion trouble

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

April 27, 2020Incidents

Tynagh Outage 25.04.2020

Publication date: 18:25 26/04/2020

Message ID: TYN_000003_03

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 23:53 25/04/2020

Estimated time/date of incident end: 10:30 27/04/2020

Unit of measurement: MW

Unavailable capacity: 440

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Plant Trip due combustion trouble

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

April 26, 2020Incidents

Tynagh Outage 25.04.2020

Publication date: 10:13 26/04/2020

Message ID: TYN_000003_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 23:53 25/04/2020

Estimated time/date of incident end: 20:00 26/04/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Plant Trip due combustion trouble

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

April 26, 2020Incidents

Tynagh Outage 25.04.2020

Publication date: 00:17 26/04/2020

Message ID: TYN_000003_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 23:53 25/04/2020

Estimated time/date of incident end: 12:00 26/04/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Plant Trip due combustion trouble

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

April 25, 2020Incidents

Tynagh Outage 21.03.2020

Publication date: 14:28 23/04/2020

Message ID: TYN_000001_010

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 20:00 21/03/2020

Estimated time/date of incident end: 19:00 25/04/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0 MW - Note the plant intends to start up for testing at 18:00 on the 23rd , also to start up at 08:00 on 24th for a testing period and from 10:00 on the 25th for baseload testing up until 19:00 and then plant intends to be fully available for dispatch from 19:00 on the 25th.

Installed capacity: 404 MW

Reason for unavailability: Scheduled Outage

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

April 23, 2020Incidents

Tynagh Outage 21.03.2020

Publication date: 23:07 21/04/2020

Message ID: TYN_000001_09

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 20:00 21/03/2020

Estimated time/date of incident end: 19:00 24/04/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Outage Extension

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

April 21, 2020Incidents

Tynagh Outage 21.03.2020

Publication date: 17:04 18/04/2020

Message ID: TYN_000001_08

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 20:00 21/03/2020

Estimated time/date of incident end: 19:00 23/04/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Scheduled Outage  – Note the plant intends to start up for testing at 09:00 on the 22nd, and intends to be fully available for dispatch at 19:00 on the 23rd.

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

April 18, 2020Incidents

Tynagh Outage 21.03.2020

Publication date: 16:24 17/04/2020

Message ID: TYN_000001_07

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 20:00 21/03/2020

Estimated time/date of incident end: 19:00 22/04/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Scheduled Outage – Note the plant intends to start up for testing at 06:00 on the 21st, and intends to be fully available for dispatch at 19:00 on the 22nd.

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

April 17, 2020Incidents

Tynagh Outage 21.03.2020

Publication date: 21:15 14/04/2020

Message ID: TYN_000001_06

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 20:00 21/03/2020

Estimated time/date of incident end: 06:00 20/04/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Scheduled Outage

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

April 14, 2020Incidents

Tynagh Outage 21.03.2020

Publication date: 15:38 03/04/2020

Message ID: TYN_000001_05

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 20:00 21/03/2020

Estimated time/date of incident end: 20:00 19/04/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Scheduled Outage

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

April 3, 2020Incidents

Tynagh Outage 21.03.2020

Publication date: 12:30 21/03/2020

Message ID: TYN_000001_04

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 20:00 21/03/2020

Estimated time/date of incident end: 20:00 12/04/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Scheduled Outage GT and ST inspections

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

March 21, 2020Incidents

Tynagh Outage 22.03.2020

Publication date: 15:40 20/03/2020

Message ID: TYN_000001_03

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 20:00 22/03/2020

Estimated time/date of incident end: 23:00 12/04/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: GT and ST inspections

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

March 20, 2020Incidents

Tynagh Outage 15.03.2020

Publication date: 17:47 15/03/2020

Message ID: TYN_000002_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 16:29 15/03/2020

Estimated time/date of incident end: 00:00 16/03/2020

Unit of measurement: MW

Unavailable capacity: 404MW

Available capacity: 0MW

Installed capacity: 404 MW

Reason for unavailability: Trip on high drum level second attempt made and Gas Turbine failed to ignite.

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

March 15, 2020Incidents

Tynagh Outage 09.12.2019

Publication date: 11:00 07/01/2020

Message ID: TYN_000018_03

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 23:00 09/12/2019

Estimated time/date of incident end: 00:30 11/12/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: HRSG drain line heat treatment

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

January 7, 2020Incidents

Tynagh Outage 09.12.2019

Publication date: 13:00 09/12/2019

Message ID: TYN_000018_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 23:00 09/12/2019

Estimated time/date of incident end: 00:30 11/12/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: HRSG drain line heat treatment

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

December 9, 2019Incidents

Tynagh Outage 07.12.2019

Publication date: 23:00 08/12/2019

Message ID: TYN_000017_02

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 12:00 07/12/2019

Estimated time/date of incident end: 23:00 08/12/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: HRSG Leak Repair

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

December 8, 2019Incidents

Tynagh Outage 07.12.2019

Publication date: 23:50 06/12/2019

Message ID: TYN_000017_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 12:00 07/12/2019

Estimated time/date of incident end: 23:00 08/12/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: HRSG Leak Repair

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

December 6, 2019Incidents

Tynagh Outage 04.12.2019

Publication date: 13:57 04/12/2019

Message ID: TYN_0016_03

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 09:39 04/12/2019

Estimated time/date of incident end: 15:15 04/12/2019

Unit of measurement: MW

Unavailable capacity: 0

Available capacity: 404

Installed capacity: 404 MW

Reason for unavailability: Purge Valve Issue

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

December 4, 2019Incidents

Tynagh Outage 15.11.2019

Publication date: 23:10 16/11/2019

Message ID: TYN_000015_04

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 06:31 15/11/2019

Estimated time/date of incident end: 23:00 16/11/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: GT trip on start up

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

November 16, 2019Incidents

Tynagh Outage 15.11.2019

Publication date: 08:50 16/11/2019

Message ID: TYN_000015_03

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 06:31 15/11/2019

Estimated time/date of incident end: 23:00 17/11/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: GT trip on start up

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

November 16, 2019Incidents

Tynagh Outage 15.11.2019

Publication date: 10:50 15/11/2019

Message ID: TYN_000015_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 06:31 15/11/2019

Estimated time/date of incident end: 23:00 16/11/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: GT trip on start up

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

November 15, 2019Incidents

Tynagh Outage 15.11.2019

Publication date: 07:09 15/11/2019

Message ID: TYN_000015_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 06:31 15/11/2019

Estimated time/date of incident end: 11:00 15/11/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: GT trip on start up

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

November 15, 2019Incidents

Tynagh Outage 12.11.2019

Publication date: 18:00 14/11/2019

Message ID: TYN_000013_03

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 23:00 12/11/2019

Estimated time/date of incident end: 17:40 14/11/2019

Unit of measurement: MW

Unavailable capacity: 0

Available capacity: 404

Installed capacity: 404 MW

Reason for unavailability:

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

November 14, 2019Incidents

Tynagh Outage 12.11.2019

Publication date: 10:03 12/11/2019

Message ID: TYN_000012_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 08:43 12/11/2019

Estimated time/date of incident end: 10:30 12/11/2019

Unit of measurement: MW

Unavailable capacity: 210

Available capacity: 194

Installed capacity: 404 MW

Reason for unavailability: Gas Turbine Valve issue

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

November 12, 2019Incidents

Tynagh Outage 12.11.2019

Publication date: 09:45 12/11/2019

Message ID: TYN_000013_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 23:00 12/11/2019

Estimated time/date of incident end: 23:00 14/11/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Gas turbine purge valve replacement

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

November 12, 2019Incidents

Tynagh Outage 12.11.2019

Publication date: 09:02 12/11/2019

Message ID: TYN_000012_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 08:43 12/11/2019

Estimated time/date of incident end: 10:00 12/11/2019

Unit of measurement: MW

Unavailable capacity: 210

Available capacity: 194

Installed capacity: 404 MW

Reason for unavailability: Gas Turbine Valve issue.

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

November 12, 2019Incidents

Tynagh Outage 05.11.2019

Publication date: 08:58 05/11/2019

Message ID: TYN_000011_03

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 06:50 05/11/2019

Estimated time/date of incident end: 08:20 05/11/2019

Unit of measurement: MW

Unavailable capacity: 0

Available capacity: 404

Installed capacity: 404 MW

Reason for unavailability: Gas Turbine Valve issue. Now resolved.

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

November 5, 2019Incidents

Tynagh Partial Outage 05.11.2019

Publication date: 06:55 05/11/2019

Message ID: Message ID: TYN_000011_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 06:50 05/11/2019

Estimated time/date of incident end: 11:00 05/11/2019

Unit of measurement: MW

Unavailable capacity: 210

Available capacity: 194

Installed capacity: 404 MW

Reason for unavailability: Gas Turbine Valve issue

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

November 5, 2019Incidents

Tynagh Outage 31.10.2019

Publication date: 10:45 31/10/2019

Message ID: TYN_000010_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 01:27 31/10/2019

Estimated time/date of incident end: 15:30 31/10/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Gas Leak

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

October 31, 2019Incidents

Tynagh Outage 22.09.2019

Publication date: 21:55 23/09/2019

Message ID: TYN_000009_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 23:00 22/09/2019

Estimated time/date of incident end: 01:00 24/09/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: HRSG Tube leak

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

September 23, 2019Incidents

Tynagh Outage 22.09.2019

Publication date: 10:40 22/09/2019

Message ID: TYN_000009_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 23:00 22/09/2019

Estimated time/date of incident end: 23:00 23/09/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: HRSG Tube leak

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

September 22, 2019Incidents

Tynagh Outage 15.09.2019

Publication date: 18:00 20/09/2019

Message ID: TYN_000008_05

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 15/09/2019

Estimated time/date of incident end: 17:00 20/09/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Planned Outage – Including post outage testing prior to full availability for dispatch. Annual Borescope Inspection

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

September 20, 2019Incidents

Tynagh Outage 15.09.2019

Publication date: 10:19 19/09/2019

Message ID: TYN_000008_04

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 15/09/2019

Estimated time/date of incident end: 17:00 20/09/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Planned Outage – Including post outage testing prior to full availability for dispatch. Annual Borescope Inspection

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

September 19, 2019Incidents

Tynagh Outage 21.03.2020

Publication date: 16:45 26/08/2019

Message ID: TYN_000001_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 22/03/2020

Estimated time/date of incident end: 23:00 12/04/2020

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: GT and ST inspections

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

August 26, 2019Incidents

Tynagh Outage 15.09.2019

Publication date: 15:15 18/09/2019

Message ID: TYN_000008_03

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 15/09/2019

Estimated time/date of incident end: 17:00 20/09/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Annual Borescope Inspection

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

August 26, 2019Incidents

Tynagh Outage 09.08.2019

Publication date: 19:15 09/08/2019

Message ID: TYN_000007_04

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 18:41 09/08/2019

Estimated time/date of incident end: 00:06 10/08/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: CASHLA 220KV LINE tripped

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

August 9, 2019Incidents

Tynagh Outage 22.06.2019

Publication date: 16:30 26/06/2019

Message ID: TYN_000006_04

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 22/06/2019

Estimated time/date of incident end: 15:42 26/06/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Gas Leak

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 26, 2019Incidents

Tynagh Outage 22.06.2019

Publication date: 10:10 25/06/2019

Message ID: Message ID: TYN_000006_03

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 22/06/2019

Estimated time/date of incident end: 16:00 26/06/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Gas Leak

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 25, 2019Incidents

Tynagh Outage 22.06.2019

Publication date: 10:10 24/06/2019

Message ID: TYN_000006_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 22/06/2019

Estimated time/date of incident end: 23:00 25/06/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Gas Leak

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 24, 2019Incidents

Tynagh Outage 22.06.2019

Publication date: 01:01 23/06/2019

Message ID: TYN_000007_02

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 17:54 22/06/2019

Estimated time/date of incident end: 23:08 22/06/2019

Unit of measurement: MW

Unavailable capacity: 130

Available capacity: 274

Installed capacity: 404 MW

Reason for unavailability: Gas leak

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 23, 2019Incidents

Tynagh Outage 22.06.2019

Publication date: 18:10 22/06/2019

Message ID: TYN_000007_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 17:54 22/06/2019

Estimated time/date of incident end: 23:00 22/06/2019

Unit of measurement: MW

Unavailable capacity: 130MW

Available capacity: 274MW

Installed capacity: 404 MW

Reason for unavailability: Gas leak

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 22, 2019Incidents

Tynagh Outage 21.06.2019

Publication date: 18:08 22/06/2019

Message ID: TYN_000005_03

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 05:59 21/06/2019

Estimated time/date of incident end: 17:54 22/06/2019

Unit of measurement: MW

Unavailable capacity: 114MW

Available capacity: 290MW

Installed capacity: 404 MW

Reason for unavailability: Hazardous gas issue

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 22, 2019Incidents

Tynagh Outage 22.06.2019

Publication date: 17:32 21/06/2019

Message ID: TYN_000006_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 23:00 22/06/2019

Estimated time/date of incident end: 23:00 24/06/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Gas Leak

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 21, 2019Incidents

Tynagh Outage 21.06.2019

Publication date: 17:22 21/06/2019

Message ID: TYN_000005_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 05:59 21/06/2019

Estimated time/date of incident end: 23:00 22/06/2019

Unit of measurement: MW

Unavailable capacity: 114MW

Available capacity: 290MW

Installed capacity: 404 MW

Reason for unavailability: Hazardous gas issue

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 21, 2019Incidents

Tynagh Outage 21.06.2019

Publication date: 06:25 21/06/2019

Message ID: TYN_000005_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 05:59 21/06/2019

Estimated time/date of incident end: 23:00 21/06/2019

Unit of measurement: MW

Unavailable capacity: 114MW

Available capacity: 290MW Gas Fuel / 300MW Distillate Fuel

Installed capacity: 404 MW

Reason for unavailability: Hazardous gas issue

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 21, 2019Incidents

Tynagh Outage 16.06.2019

Publication date: 13:10 19/06/2019

Message ID: TYN_000004_03

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 23:00 16/06/2019

Estimated time/date of incident end: 18:00 19/06/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Gas Leak

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 15, 2019Incidents

Tynagh Outage 14.06.2019

Publication date: 16:47 15/06/2019

Message ID: TYN_000003_03

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 18:21 14/06/2019

Estimated time/date of incident end: 23:00 16/06/2019

Unit of measurement: MW

Unavailable capacity: 108MW

Available capacity: 296MW

Installed capacity: 404 MW

Reason for unavailability: Restricted Gas Fuel Max Availability

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 14, 2019Incidents

Tynagh Outage 11.06.2019

Publication date: 05:47 14/06/2019

Message ID: TYN_000002_03

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 19:38 11/06/2019

Estimated time/date of incident end: 10:15 14/06/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Boiler Leak

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 14, 2019Incidents

Tynagh Outage 11.06.2019

Publication date: 17:25 12/06/2019

Message ID: TYN_000002_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 19:38 11/06/2019

Estimated time/date of incident end: 08:00 14/06/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Boiler Leak

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 11, 2019Incidents

Tynagh Outage 31.05.2019

Publication date: 23:13 10/06/2019

Message ID: TYN_000001_10

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 31/05/2019

Estimated time/date of incident end: 22:45 10/06/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Planned Outage - Extended

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 10, 2019Incidents

Tynagh Outage 31.05.2019

Publication date: 11:10 08/06/2019

Message ID: TYN_000001_09

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 31/05/2019

Estimated time/date of incident end: 22:45 10/06/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Outage Extended

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 8, 2019Incidents

Tynagh Outage 31.05.2019

Publication date: 11:05 07/06/2019

Message ID: TYN_000001_08

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 31/05/2019

Estimated time/date of incident end: 23:00 09/06/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Outage Extended

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 7, 2019Incidents

Tynagh Outage 31.05.2019

Publication date: 09:58 06/06/2019

Message ID: TYN_000001_07

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 31/05/2019

Estimated time/date of incident end: 23:00 08/06/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Planned Outage - Extended

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 6, 2019Incidents

Tynagh Outage 31.05.2019

Publication date: 16:15 04/06/2019

Message ID: TYN_000001_06

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 31/05/2019

Estimated time/date of incident end: 23:00 07/06/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Planned Outage - Extended

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 4, 2019Incidents

Tynagh Outage 31.05.2019

Publication date: 09:58 03/06/2019

Message ID: TYN_000001_05

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 31/05/2019

Estimated time/date of incident end: 23:00 05/06/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Planned Outage - Extended

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 3, 2019Incidents

Tynagh Outage 31.05.2019

Publication date: 10:20 02/06/2019

Message ID: TYN_000001_04

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 31/05/2019

Estimated time/date of incident end: 23:00 03/06/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Planned Outage - Extended

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 2, 2019Incidents

Publication date: 02:50 02/06/2019

Message ID: TYN_000001_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 31/05/2019

Estimated time/date of incident end: 12:00 02/06/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Planned Outage - Extended

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 2, 2019Incidents

Tynagh Outage 16.02.2019

Publication date: 17:15 17/02/2019

Message ID: TYN_000001_03

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 16/02/2019

Estimated time/date of incident end: 18:30 17/02/2019

Unit of measurement: MW

Unavailable capacity: 0

Available capacity: 404

Installed capacity: 404 MW

Reason for unavailability: Planned outage

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

February 17, 2019Incidents

Tynagh Outage 16.02.2019

Publication date: 15:15 16/02/2019

Message ID: TYN_000001_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 23:00 16/02/2019

Estimated time/date of incident end: 23:00 17/02/2019

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Planned outage

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

February 16, 2019Incidents

Tynagh Outage 01.12.2018

Publication date: 10:00 03/12/2018

Message ID: TYN_000001_02

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 19:00 01/12/2018

Estimated time/date of incident end: 01:00 02/12/2018

Unit of measurement: MW

Unavailable capacity: 104

Available capacity: 300

Installed capacity: 404 MW

Reason for unavailability: GT Fuel Testing

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

December 3, 2018Incidents

Tynagh Outage 01.12.2018

Publication date: 18:05 30/11/2018

Message ID: TYN_000001_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 19:00 01/12/2018

Estimated time/date of incident end: 01:00 02/12/2018

Unit of measurement: MW

Unavailable capacity: 104

Available capacity: 300

Installed capacity: 404 MW

Reason for unavailability: GT Fuel Testing

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

November 30, 2018Incidents

Tynagh Outage 24.11.2018

Publication date: 06:40 25/11/2018

Message ID: TYN_000001_03

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 23:10 24/11/2018

Estimated time/date of incident end: 19:09 25/11/2018

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Plant tripped due to high exhaust temperature.

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

November 25, 2018Incidents

Tynagh Outage 20.11.2018

Publication date: 06:50 20/11/2018

Message ID: TYN_000001_01

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 06:06 20/11/2018

Estimated time/date of incident end: 08:01 20/11/2018

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Unit Trip

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

November 20, 2018Incidents

Tynagh Outage 15.06.2018

Publication date: 00:55 16/06/2018

Message ID: TYN_000001_08

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 23:44 15/06/2018

Estimated time/date of incident end: 17:00 31/07/2018

Unit of measurement: MW

Unavailable capacity: 26

Available capacity: 378

Installed capacity: 404 MW

Reason for unavailability: Suspected Gas Turbine Water Injection system lockout which caused high exhaust temperature trip

Remarks:

Distillate remains declared to 0

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 15, 2018Incidents

Tynagh Outage 15.06.2018

Publication date: 00:52 16/06/2018

Message ID: TYN_000001_02

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 22:14 15/06/2018

Estimated time/date of incident end: 23:44 15/06/2018

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Suspected Gas Turbine Water Injection system lockout which caused high exhaust temperature trip

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 15, 2018Incidents

Tynagh Outage 15.06.2018

Publication date: 23:08 15/06/2018

Message ID: TYN_000001_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 22:14 15/06/2018

Estimated time/date of incident end: 01:00 16/06/2018

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Suspected Gas Turbine Water Injection system lockout which caused high exhaust temperature trip

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

June 15, 2018Incidents

Tynagh Outage 07.11.2017

Publication date: 03:00 07/11/2017

Message ID: TYN_00001_03

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 01:30 07/11/2017

Estimated time/date of incident end: 12:45 07/11/2017

Unit of measurement: MW

Unavailable capacity: 404 MW

Available capacity: 0 MW

Installed capacity: 404 MW

Reason for unavailability:

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

November 7, 2017Incidents

Tynagh Outage 07.11.2017

Publication date: 03:30 07/11/2017

Message ID: TYN_000002_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 01:30 07/11/2017

Estimated time/date of incident end: 01:30 08/11/2017

Unit of measurement: MW

Unavailable capacity: 404 MW

Available capacity: 0 MW

Installed capacity: 404 MW

Reason for unavailability: Problem on the GT static starter (LCI). Appears there is an issue with the LCI knife switches/assembly.

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

November 7, 2017Incidents

Tynagh Outage 07.11.2017

Publication date: 03:31 07/11/2017

Message ID: TYN_000001_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 01:30 07/11/2017

Estimated time/date of incident end: 08:00 07/11/2017

Unit of measurement: MW

Unavailable capacity: 404 MW

Available capacity: 0 MW

Installed capacity: 404 MW

Reason for unavailability: Plant is currently declared to zero due to a problem on the GT static starter (LCI). Issue is currently being investigated.

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

November 7, 2017Incidents

Tynagh outage 15.09.2017

Publication date: 22:30 15/09/2017

Message ID: TYN_000001_02

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 21:29 15/09/2017

Estimated time/date of incident end: 21:29 16/09/2017

Unit of measurement: MW

Unavailable capacity:

Available capacity: 404

Installed capacity: 404 MW

Reason for unavailability:

Plant is currently declared to a minimum load of 300MW’s due to purge valve issue.

This prevents the GT going into Diffusion mode D5.

EC&I informed and currently working on the issue.

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

September 15, 2017Incidents

Tynagh outage 15.09.2017

Publication date: 22:50 15/09/2017

Message ID: TYN_000001_03

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 21:29 15/09/2017

Estimated time/date of incident end: 22:31 15/09/2017

Unit of measurement: MW

Unavailable capacity:

Available capacity: 404

Installed capacity: 404 MW

Reason for unavailability: Minimum load had increased from 194 to 300 Issue with GT purge valve is rectified and the plant is declared to its normal availability.

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

September 15, 2017Incidents

Tynagh Outage 15.09.2017

Publication date: 21:54 15/09/2017

Message ID: TYN_000001_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 21:29 15/09/2017

Estimated time/date of incident end: 21:29 16/09/2017

Unit of measurement: MW

Unavailable capacity: 104

Available capacity: 300

Installed capacity: 404 MW

Reason for unavailability: Plant is currently declared to a minimum load of 300MW’s due to purge valve issue. This prevents the GT going into Diffusion mode D5. EC&I informed and currently working on the issue.

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

September 15, 2017Incidents

Tynagh Outage 13.09.2017

Publication date: 18:50 14/09/2017

Message ID: TYN_000003_03

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 07:30 13/09/2017

Estimated time/date of incident end: 18:30 14/09/2017

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Cause of Outage: Gas Turbine System

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

September 14, 2017Incidents

Tynagh Outage 13.09.2017

Publication date: 10:50 14/09/2017

Message ID: TYN_000003_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 07:30 13/09/2017

Estimated time/date of incident end: 06:00 15/09/2017

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Cause of Outage: Gas Turbine System Repairs and testing ongoing

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

September 14, 2017Incidents

Tynagh Outage 13.09.2017

Publication date: 13:30 13/09/2017

Message ID: TYN_000003_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 07:30 13/09/2017

Estimated time/date of incident end: 06:00 14/09/2017

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Cause of Outage: Gas Turbine System Repairs and testing ongoing

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

September 13, 2017Incidents

Tynagh Outage 13.09.2017

Publication date: 13:00 13/09/2017

Message ID: TYN_000003_02

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 07:30 13/09/2017

Estimated time/date of incident end: 18:00 13/09/2017

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Cause of Outage: Gas Turbine System

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

September 13, 2017Incidents

Tynagh Outage 13.09.2017

Publication date: 09:50 13/09/2017

Message ID: TYN_000003_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 07:30 13/09/2017

Estimated time/date of incident end: 13:00 13/09/2017

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Cause of Outage: Gas Turbine System

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

September 13, 2017Incidents

Tynagh Outage 19.05.2017

Publication date: 22:10 19/05/2017

Message ID: TYN_000002_04

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: planned

Time/date of incident start: 22:00 19/05/2017

Estimated time/date of incident end: 20:30 23/05/2017

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Planned Outage. Outage extension due to emergent works

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

May 19, 2017Incidents

Tynagh Outage 07.11.2016

Publication date: 16:30 07/11/2016

Message ID: TYN_000001_02

Event Status: closed

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 09:00 07/11/2016

Estimated time/date of incident end: 16:01 07/11/2016

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Gas Turbine Purge System

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

January 16, 2017Incidents

Tynagh Outage 07.11.2016

Publication date: 09:30 07/11/2016

Message ID: TYN_000001_01

Event Status: open

Type of unavailability: Production Unavailability

Type of event: unplanned

Time/date of incident start: 09:00 07/11/2016

Estimated time/date of incident end: 09:00 08/11/2016

Unit of measurement: MW

Unavailable capacity: 404

Available capacity: 0

Installed capacity: 404 MW

Reason for unavailability: Gas Turbine Purge System

Remarks:

Fuel Type: Fossil Gas

Bidding Zone: 10Y1001A1001A59C

Affected Asset or Unit: Tynagh Production Unit

Affected Asset or Unit EIC: 47W000000000172K

Market Participant: Tynagh Energy Limited

Market Participant Code: A0001577W.IE

January 16, 2017Incidents

Subscribe to our RSS Feed

Recent Incidents

  • Information note on Tynagh's transition to Nordpool's IIP
  • Information note on Tynagh's transition to Nordpool's IIP
  • Tynagh move to nordpool
  • Information note on Tynagh's transition to Nordpool's IIP
  • Tynagh Outage 22.06.2020

Incident Archive

Contact Info

Email: info@tynaghenergy.ie
Tel:  +353 (0)1 857 8700
Fax: +353 (0)1 857 8701

Address

Tynagh Energy Limited The Crescent Building Northwood Park Santry, Dublin 9
D09 X8W3
Ireland

Local Community

Recent REMIT Notifications

  • Information note on Tynagh's transition to Nordpool's IIP
  • Information note on Tynagh's transition to Nordpool's IIP
  • Tynagh move to nordpool
  • Information note on Tynagh's transition to Nordpool's IIP
  • Tynagh Outage 22.06.2020
© 2013 Tynagh Energy Limited | CRN:378735 | Disclaimer
Back to Top
health check